Contract Term Definition

The definition of terms in contract document:-

Quote – the price offered by the contractor to do the work

Preliminaries – these are the costs for items required to carry out the contract other than the actual construction works eg. Travelling costs, the hire of scaffolding or other items of plant, office or other administrative costs

Provisional sums –an amount included in the contract sum/agreed quote for additional works that are not fully specified

Variations – these are the works that arise during construction which were not allowed for in the quote

PC Sum (Prime Cost Sum) – a sum of money allowed for an item or work or materials supplied by the client eg. Installation of a fire alarm system by a specialist already selected by the client, or the cost of a bathroom suite already purchased by the client

Retention – sum of money set aside by the client (you) from the contract sum until the works are completed to your satisfaction

(quoted from http://www.rics.org/Services/BCIS/pr_bcis_guide061006.html )

19 August, 2008

CAR PARK DIMENSION

You may not aware that the car parking dimension has different requirement as for different angle of parking lot.


15 August, 2008

Transit Railway System - Learn It

Effective Successful Transit Railway System


Hong Kong Railway


http://www.rcm-advies.nl/Webpagina's/Transit%20Systems/Hong%20Kong%20-%20his.htm
The Mass Transit Railway (MTR) Corporation of Hong Kong was established in 1975 with the aim to study, plan, construct, and operate a metro system for the British crown colony. This resulted in a total of three lines with an overall route length of 43.2 kilometres, 38 stations, and a total of 671 rail cars. Each line was built at separate times with the first one starting its full operation in late 1979, followed by the Tsuen Wan extension in 1982, the Island Line in 1986, and the Eastern Harbour Crossing in 1989. Of the 38 stations, 30 are underground.....................


Japn Railway

http://www.tokyometro.jp/global/en/about/history.html
1920 Aug. 29 Establishment of the Tokyo Underground Railway Company

1925 Sep. 27 Start of construction on the section between Asakusa and Ueno by the Tokyo Underground Railway Company

1927 Dec. 30 Tokyo Underground Railway Company-opening of the first subway section between Asakusa and Ueno

1934 Jun. 21 Tokyo Underground Railway Company-opening of the section between Ginza and Shimbashi.......................


Singapore Railway


http://www.lta.gov.sg/public_transport/pt_rail_tracing.htm
The 1960s was an era of great economic changes for Singapore. The city's leaders were convinced of the need to support the economy with a reliable and efficient transport system to support nation building. To this end, the government commissioned a State and City Planning study in 1967 to study the possibility of expanding the transport network. Amongst others, the findings of the four-year study pointed to a need for a rail transit system by 1992.
In May 1982, the Government gave the go-ahead and work on the construction of the MRT began. The S$5 billion project was targeted to be completed in 1992. The 67 km-long route would boast 42 stations, of which 27 would be above ground and 15 underground. The north-south line was implemented first as more people need to be ferried across the busy Orchard corridor and the Central Business District. On 14 October 1983, the MRT Corporation was established…...........


London Railway

http://homepage.ntlworld.com/clivebillson/tube/tube.html#Today
Inset into an original geographical map, which is the same style as Britain's railway maps produced since the first railways in the 1840s, this map is a late example (1905) of how the earlier underground maps looked from 1863, when the first underground railway was opened, until around 1906........



Malaysia Railway

Malaysia Transit Railway is still young compare to the above countries. However, when the neighbour country Singapore can catch up with the developed country, like Japan, UK, etc. I don't see there is any reason why can't Malaysia take the same pace. There is a proven track that technology and expertise can be learned.

Learn from the successful railway system would eliminate a lot of unforeseeable mistakes and errors. The Railway Route must be incorporated into the town planning blueprint. There is nothing to shy from learning others technology and system. This is so called history study!

Wider Vision takes the Lead. Plan 20 years ahead from now rather than 2 years. Put your eye sight in the farther destination. A Strong Public Transport Department must be established to plan ahead and control effectively on the implementation to achieve this MEGA VISION.


14 August, 2008

Highest Elevated Bridge Construction Stages

This is one of the great creation of Human being.

Pier construction...
All piers are marked and construct concurrently..
Each Tower Crane for one pier, access to deliver material to respective pier also must be consider carefully.

Then. the bridge deck will be constructed..


Photo shooting from top to bottom.


Suspension deck to connect one pier to another.

Work was proceed day and night.


Pier is standing right above the sky level.


Is this bridge link to heaven..?


Tension is used to support the deck.


This is interesting while seeing the bridge surrounded in mist.


I salute at those engineers and workers who dare to work at such height.


Bottom of deck..


Side view of bridge.


A Bridge linking to Sky?


Great Team.. great work..


Heavy tension is used..


The system of bridge construction.



It is great..
Great man made sky bridge.
It is completed.
Its launching opening...!! yahoo..