17 May, 2008

Advance Car Park

Nowadays, land is getting more expensive. Solely building a car park can not afford to offset the development cost.

But this kind of car park system is a new possibility. It can be built in underground system.

May be the above car park is too complicated and sophisticated to be adopted in developing country. Perhaps a simplified car park as below can help.

When can this system being wide use in the country is greatly depend on the cost of the mechanical car park system. Personally I think it is feasible.

15 May, 2008

Car Park In Condominium

Let's start a puzzle... Can you see where goes wrong at this car park?

See carefully, there is a door behind. There is a FIRE ESCAPE DOOR. By right, the escape route shall be clear from all obstruction. Why the developer or Architect or even local Authority who approve the plan, is so careless? They shall be punished for this silly mistakes. Is it a mistakes or purpose-made error to save cost?

Secondly, after car is driven in and parked nicely. It looks so fit....Maybe just too "fit"..

Too "fit" until the driver can not come out from the car. The dimension is not being consider and think. Then, the Architect simply plot it on the plan.

That's why there is a need to engage the RIGHT PERSON do the RIGHT THING... This is of
excellent" job, You can only find it with Peluang Mutiara S/B as a unscrupulous developer for this development.

I would say stupid and darn STUPID!

06 May, 2008

Sheet Piling Alignment Setting Out

As promised, gradually I will reveal more information regarding to the silient piler - Operation of Sheet Pile Installation.

This is the Silient piler machine. The weight is about 9 ton. It is self standing with its powerful hydraulic grip. Today, here, I wanted to share about the accurate sheet piling operation.

How to ensure the alignment of sheet piles is in line with the setting out that you wanted?

This is the sheet piler..


What the hell is it?.... funny stuff...!!

See carefully.. It is a laser pointer.. The surveyor peg the point right on the pipe. (blue dot in a circle). With its flexible grip, it can be securely mounted on the pipe.

Can you see.. the laser is shooting to the sheet piling machine..

It can be installed in multiple angle.


The red laser pointer is generated with its self rechargeable batery which can last for long hours. It is a weather resistance type of laser pointer.

With this assistance it can improve the accuracy of the sheet piling alignment.

The laser pointer can be easily installed by simple frame work planted on ground.

Can you see the small little red spot ..?

Can you see the red spot?.. still cannot?!

If you can see the red spot, you can understand the entire operation of sheet piling work...

This is a situation when the sheet pile is out of alignment. .. the sheet pile is misaligned and twisted.

Adjust it can back to its correct path..!! You see the red spot.. the whole installation process, the red spot shall pointed at the front line of the sheet piles.

Of course, you still need somebody who is responsible to check on the position of red spot. otherwise, the sophisticated laser pointer wil becomes wasted..

02 May, 2008

Building Architect Complaint Channel

Any fault on building design which found against Uniform Building By Law (UBBL) in Malaysia can seek advice or assistance from the below address.

If found that the Architect doesn't act professionally, consumer can always file complaint, because most of the time, Architect is engaged by developer. It may they tends to bias or sided to developer.

I do hope they can hold firm on their ethic duty and act fairly to all parties.

Pertubuhan Arkitek Malaysia
4&6 Jalan Tangsi
50480 Kuala Lumpur
Tel:03-2693 4182